Location:: Gulfport, Mississippi
Description: This project consisted of 97 drilled shaft foundations 60 inches in diameter, between 90 and 120 feet in depth. Phase I of the project had to be constructed in between the two existing I10 bridges, leaving a working width of only eighty feet (80’). The scope of work also included an Osterberg cell load test for design verification.
General Contractor: L & A Contracting Co.
Owner: Mississippi Department Of Transportation