AT_and_T_CENTER_RETENTION_SYSTEM_04
Location: San Antonio, TX

The project consisted of 1880 drilled shafts 18” – 42” diameters, up to 90 feet deep with some bells 90” - all for the new home of the San Antonio Spurs. The project also included 145 — 24” soldier piers, some 38’ deep for a system designed to protect the existing Freeman Coliseum and drilled a tunnel connecting the two structures. A. H. Beck performed layout, drilled shaft excavation, and spoil removal - all turnkey.

CONSTRUCTION MANAGER: Project Control of Texas

GENERAL CONTRACTOR: Hunt Construction

OWNER: Bexar County, San Antonio, Texas